President Adama Barrow announced plans to upgrade infrastructure in Kanifing Municipality, focusing on road development and athletic facility renovations. During a recent visit, President Adama Barrow promised to oversee the construction of 180 kilometres of roads across the area, stating, "KM alone has 180 kilometre of roads that we should build in the municipality." This ambitious infrastructure initiative seeks to address the logistical challenges currently faced by residents and commuters within the municipality, aiming to improve connectivity through a full road-building program.
Addressing the state of local sporting facilities, President Adama Barrow pledged to redevelop the football field in Manjai to a standard field. He noted the current poor condition of the grounds, remarking, "I felt sad when saw the condition of this ground because it used to have a very good turf which even hosted some big football matches but I’ll take a decision to redevelop it to a standard field." The commitment to the Manjai facility is part of a broader focus on public amenities, as the president emphasized the importance of restoring community spaces to a functional and competitive status. By upgrading the field, the administration intends to provide local athletes and youth with a venue that meets modern requirements for sporting events.
Water Supply Improvement Plans
President Adama Barrow met with residents of Serekunda West, Bakau, and Jeshwang on Sunday, 18 October 2026, to discuss infrastructure and utility concerns. The meeting served as a platform for the president to engage directly with the local populations of these specific areas. During these consultations, President Adama Barrow stated that the affected communities are included in an ongoing water project managed by the Organisation of Islamic Cooperation (OIC). The inclusion of these areas in the project is intended to address the specific utility needs raised by the residents during the Sunday gathering.
President Adama Barrow assured the residents that improvements in water supply for these areas would be visible within six months. The timeline provided by the president follows his discussions with the local populations regarding the current state of public services in the Kanifing Municipality. This pledge regarding the water supply is a central component of the government's strategy to stabilize essential services for the residents of Serekunda West, Bakau, and Jeshwang. By setting a six-month window for visible progress, President Adama Barrow has established a clear expectation for the delivery of the water project under the Organisation of Islamic Cooperation. The administration maintains that these infrastructure and utility upgrades are vital for the continued development of the Kanifing Municipality and the well-being of its citizens.